Your Perfect Assignment is Just a Click Away

Starting at $8.00 per Page

100% Original, Plagiarism Free, Customized to Your instructions!

glass
pen
clip
papers
heaphones

PROD10214 Advanced Principles in Lean Manufacturing Referred/Deferred coursework 2021

PROD10214 Advanced Principles in Lean Manufacturing Referred/Deferred coursework 2021

PROD10214 Advanced Principles in Lean Manufacturing Referred/Deferred coursework 2021

Refer to the case study data (below) and:

i) Draw the current state map for the Value Stream. (30 marks)

ii) Outline the major questions which should be asked, and answered, when developing a future

state map. (20 marks)

iii) Use your answer to ii) to develop and draw a Future State Map, outlining the improvements

made by implementing a lean manufacturing strategy in this organisation. (30 marks)

iv) Produce an outline implementation plan for the transformation. (20 marks)

Case Study Data

Medway Manufacturing Ltd produces hand tools for DIYbase, a major national retailer. One particular line produces scissors in left-handed (LH) and right-handed (RH) ergonomic versions.

Production Processes

 The line’s manufacturing process involves cold-forging scissor halves from steel, grinding the blades,

assembly and packaging.

 The finished scissors are boxed and shipped to the customer’s distribution centre daily.

 50 rods of steel (raw material) are delivered by the supplier, 2 times each month.

Customer requirements

 500 pairs of scissors per day. Of which:

o 400 are right handed

o 100 are left handed

 Scissors are to be shipped on cards of 25 pairs per card.

 The customer orders in multiples of cards.

 One daily shipment is sent to the customer by truck.

Work time

 20 working days per month

 1 shift of 8 hours per day, one 1⁄2 hour break for lunch, and two 10 minute coffee breaks per day.

Production Control

 MRP system.

 Customer emails demand forecast each week to cover the next quarter year.

 Fax monthly order for raw material to supplier

 Customer emails daily firm order

 Issues weekly schedule to forging, grinding and assembly processes

 Issues daily shipping schedule to despatch Process information

The processes occur in the following sequence and each workpiece passes through all the processes.

1) Cold-forging

 Cycle time = 2 seconds

 Change-over time = 65 minutes

 Inventory in front of the process = 50 rods of raw material (equivalent to 10 days worth)

 Uptime = 90%

 1 operator

2) Grinding

 Cycle time = 40 seconds

 Change-over time = 15 minutes

 Inventory in front of process = 4000 RH sets, 1000 LH sets

 

 Uptime = 85%

 1 operator

3) Assembly

 Cycle time = 56 seconds

 Change-over time = 10 minutes

 Inventory in front of process = 3200 RH sets, 800 LH sets

 Uptime = 100%

 2 operators

4) Packaging

 Cycle time = 2 minutes per card

 Changeover time = 30 seconds

 Inventory in front of process = 2000 RH pairs, 500 LH pairs

 Uptime = 100%

 1 operator

5) Shipping

 One shipment per day, typically of 20 cards

 Inventory before shipping = 480 cards of RH pairs, 120 cards of LH pairs


"Place your order now for a similar assignment and have exceptional work written by our team of experts, guaranteeing you A results."

Order Solution Now

Our Service Charter


1. Professional & Expert Writers: Ace Papers only hires the best. Our writers are specially selected and recruited, after which they undergo further training to perfect their skills for specialization purposes. Moreover, our writers are holders of masters and Ph.D. degrees. They have impressive academic records, besides being native English speakers.

2. Top Quality Papers: Our customers are always guaranteed of papers that exceed their expectations. All our writers have +5 years of experience. This implies that all papers are written by individuals who are experts in their fields. In addition, the quality team reviews all the papers before sending them to the customers.

3. Plagiarism-Free Papers: All papers provided by Ace Papers are written from scratch. Appropriate referencing and citation of key information are followed. Plagiarism checkers are used by the Quality assurance team and our editors just to double-check that there are no instances of plagiarism.

4. Timely Delivery: Time wasted is equivalent to a failed dedication and commitment. Ace Papers is known for the timely delivery of any pending customer orders. Customers are well informed of the progress of their papers to ensure they keep track of what the writer is providing before the final draft is sent for grading.

5. Affordable Prices: Our prices are fairly structured to fit in all groups. Any customer willing to place their assignments with us can do so at very affordable prices. In addition, our customers enjoy regular discounts and bonuses.

6. 24/7 Customer Support: At Ace Papers, we have put in place a team of experts who answer all customer inquiries promptly. The best part is the ever-availability of the team. Customers can make inquiries anytime.